Row House | |||
Raw House |
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 6 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 246.8/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3049 339 283 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3049 339 283 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 4650 517 432 | 3049 339 283 |
Covered Area on Ground | As per Set Back | 1447 161 134 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.31 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 7 2 2 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | DRAWING ROOM | 1 |
East | DRAWING ROOM | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | STAIRS | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | STAIRS | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | KITCHEN | 0 |
East | DINING | 0 |
South East | DRAWING | 1 |
South | DRAWING | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 0 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET/ DRESS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | KITCHEN | 0 |
West | DINING | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | KITCHEN | 0 |
East | DINING | 0 |
South East | DRAWING | 0 |
South | DRAWING | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESS | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 6 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 251.1/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3068 341 285 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3068 341 285 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 4650 517 432 | 3068 341 285 |
Covered Area on Ground | As per Set Back | 1487 165 138 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.32 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 7 2 2 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 1 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET/ DRESS | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 1 |
North East | BEDROOM | 0 |
East | DINING | 0 |
South East | KITCHEN | 1 |
South | DRAWING | 0 |
South West | DRAWING | 1 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | TOILET/ DRESS | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | DINING | 0 |
South West | KITCHEN | 0 |
West | DRAWING | 0 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 12.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | TOILET/ DRESS | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | KITCHEN | 0 |
East | DRAWING | 1 |
South East | DRAWING | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET/ DRESS | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 6 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 222.64/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2774 308 258 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2774 308 258 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 4650 517 432 | 2774 308 258 |
Covered Area on Ground | As per Set Back | 1309 145 122 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.19 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 8 3 2.5 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | DRAWING ROOM | 1 |
East | DRAWING ROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET/ DRESS | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | BEDROOM | 1 |
South East | KITCHEN | 1 |
South | STOR | 1 |
South West | DRAWING ROOM | 0 |
West | BEDROOM | 1 |
North West | TOILET/ DRESS | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BALCONY | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRS | 0 |
South West | KITCHEN | 0 |
West | DINING | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | KITCHEN | 0 |
East | DINING | 0 |
South East | DRAWING ROOM | 0 |
South | DRAWING ROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BALCONY | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 6 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 236.1/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2924 325 272 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2924 325 272 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | As per set back | 2924 325 272 |
Covered Area on Ground | As per Set Back | 1384 154 129 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.26 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 8 3 2.5 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | DRAWING ROOM | 1 |
East | STAIRCASE | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET/ DRESS | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BALCONY | 1 |
East | STAIRCASE | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET/ DRESS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | TOILET/ DRESS | 0 |
South East | KITCHEN | 1 |
South | DINING | 0 |
South West | DRAWING ROOM | 0 |
West | STAIRCASE | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | TOILET/ DRESS | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESS | 1 |
South West | KITCHEN | 0 |
West | DINING | 1 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESS | 0 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET/ DRESS | 0 |
North East | KITCHEN | 0 |
East | LIVING | 1 |
South East | DRAWING ROOM | 0 |
South | STAIRCASE | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET/ DRESS | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 4 |
No. of Toilets | 5 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 171.9/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2189 243 203 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2189 243 203 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 3875 431 360 | 2189 243 203 |
Covered Area on Ground | As per Set Back | 1146 127 107 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.13 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 7 2 2 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | STAIRS/TOILET | 0 |
South East | DRAWING ROOM | 0 |
South | DRAWING ROOM | 0 |
South West | DRAWING | 0 |
West | TOILET | 1 |
North West | KITCHEN/DINING | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | STAIRS/TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | DRAWING | 1 |
East | TOILET | 0 |
South East | KITCHEN | 1 |
South | DINING | 0 |
South West | MASTER BEDROOM | 1 |
West | STAIRS/TOILET | 1 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | TOILET / DRESSING | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS / TOILET | 0 |
North East | DRAWING ROOM | 1 |
East | DRAWING ROOM | 1 |
South East | DRAWING | 0 |
South | TOILET | 1 |
South West | KITCHEN | 0 |
West | DINING | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | KITCHEN | 0 |
East | DINING | 0 |
South East | BEDROOM | 0 |
South | STAIRS/TOILET | 1 |
South West | DRAWING ROOM | 0 |
West | DRAWING ROOM | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET / DRESSING | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET/STAIRS | 1 |
South West | BEDROOM | 0 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 4 |
No. of Toilets | 4 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 191.5/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2448 272 227 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2448 272 227 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 3875 431 360 | 2448 272 227 |
Covered Area on Ground | As per Set Back | 1146 127 107 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.26 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | DRAWING ROOM | 0 |
South | DRAWING ROOM | 0 |
South West | DRAWING ROOM | 0 |
West | STAIRS | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | TERRACE | 1 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | STAIRS/DINING | 0 |
South East | KITCHEN | 1 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | TOILET | 1 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | TERRACE | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | DRAWING ROOM | 1 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | STAIRS/DINING | 1 |
South West | KITCHEN | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS/GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS/DINING | 0 |
North East | KITCHEN | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | DRAWING ROOM | 0 |
West | DRAWING ROOM | 0 |
North West | STAIRS/DINING | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | TERRACE | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 4 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 171.9/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2189 243 203 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2189 243 203 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 3875 431 360 | 2189 243 203 |
Covered Area on Ground | As per Set Back | 1017 113 95 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.13 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | DRAWING ROOM | 0 |
South | DRAWING ROOM | 0 |
South West | DRAWING ROOM | 0 |
West | TOILET | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | TERRACE | 1 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 0 |
East | TOILET | 0 |
South East | KITCHEN | 1 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | DRAWING ROOM | 1 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | TOILET | 1 |
South West | KITCHEN | 0 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | KITCHEN | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 0 |
South West | DRAWING ROOM | 0 |
West | DRAWING ROOM | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | TERRACE | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 4 |
No. of Toilets | 5 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 238.5/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2907 323 270 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2907 323 270 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 4108 456 382 | 2907 323 270 |
Covered Area on Ground | As per Set Back | 1385 154 129 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.42 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 7 2 2 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING/ STAIRS | 0 |
North East | LIVING | 1 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 0 |
West | TOILET/ DRESSING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | LIVING/ BALCONY | 1 |
East | BEDROOM | 1 |
South East | TOILET/ DRESSING | 0 |
South | TOILET | 1 |
South West | BEDROOM | 1 |
West | TOILET/ DRESSING | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | TOILET/ DRESSING | 0 |
South East | KITCHEN | 1 |
South | DINING/ STAIRS | 1 |
South West | LIVING | 0 |
West | DRAWING ROOM | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | TOILET / DRESSING | 0 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | LIVING | 0 |
West | BEDROOM | 1 |
North West | TOILET/ DRESSING | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESSING | 1 |
South West | KITCHEN | 0 |
West | DINING/ STAIRS | 1 |
North West | LIVING | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET/ DRESSING | 1 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESSING | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | LIVING | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET/ DRESSING | 0 |
North East | KITCHEN | 0 |
East | DINING/ STAIRS | 0 |
South East | LIVING | 0 |
South | DRAWING ROOM | 0 |
South West | DRAWING ROOM | 0 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET / DRESSING | 0 |
North East | BEDROOM | 0 |
East | STAIRS | 0 |
South East | LIVING | 0 |
South | BEDROOM | 1 |
South West | TOILET/ DRESSING | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 5 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 251.9/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3054 339 284 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3054 339 284 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 4108 456 382 | 3054 339 284 |
Covered Area on Ground | As per Set Back | 1458 162 135 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.46 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 7 2 2 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | STAIRS | 1 |
South West | KITCHEN/ DINING | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LIVING | 1 |
North East | BALCONY | 1 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | STAIRCASE | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | KITCHEN/ DINING | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | DRAWING ROOM | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | BEDROOM | 0 |
East | TOILET / DRESSING | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | STAIRS | 0 |
South East | KITCHEN/ DINING | 1 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | STAIRCASE | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESSING | 1 |
South West | MASTER BEDROOM | 1 |
West | LIVING | 0 |
North West | LIVING | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | DRAWING ROOM | 0 |
South West | DRAWING ROOM | 0 |
West | STAIRS | 0 |
North West | KITCHEN/ DINING | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET / DRESSING | 0 |
North East | BEDROOM | 0 |
East | LIVING | 1 |
South East | LIVING | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | STAIRCASE | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 5 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 247.4/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3007 334 279 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3007 334 279 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 4108 456 382 | 3007 334 279 |
Covered Area on Ground | As per Set Back | 1394 155 130 |
Balconies / Covered | 4 1 1.2 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 1.46 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | KITCHEN | 0 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | DINING | 0 |
South West | MASTER BEDROOM | 0 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | LIVING | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | KITCHEN | 0 |
West | DRAWING ROOM | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | LIVING | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | DINING | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | LIVING | 0 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | STAIRCASE | 0 |
South East | KITCHEN | 1 |
South | DRAWING ROOM | 0 |
South West | DRAWING ROOM | 0 |
West | DINING | 0 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET / DRESSING | 0 |
North East | LIVING | 1 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management