Semi Detached | |||
Semi Detached |
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 6 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 252/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2994 333 278 |
Staircase | 124 14 12 |
Balconies / Covered | 221.2 24.58 20.55 |
Garage / Servant Quarter | 0 0 0 |
Porch | 323 36 30 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3662 407 340 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 3100 344 288 | 2992 332 278 |
Covered Area on Ground | 1550 172 144 | 1505 167 140 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.97 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | KITCHEN | 0 |
East | DINING | 1 |
South East | BEDROOM | 1 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | STAIRCASE | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 1 |
East | LIVING AREA | 1 |
South East | BEDROOM | 1 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | STAIRCASE | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 100% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 1 |
East | STAIRCASE | 0 |
South East | DRAWING AREA | 0 |
South | DRAWING | 0 |
South West | KITCHEN | 0 |
West | DINING | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 1 |
East | STAIRCASE | 0 |
South East | TOILET | 0 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | LIVING AREA | 0 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | DRAWING | 1 |
East | DRAWING | 1 |
South East | KITCHEN | 1 |
South | DINING | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | TOILET | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 1 |
South | LIVING AREA | 0 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | BEDROOM | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 1 |
South | STAIRCASE | 1 |
South West | DRAWING | 0 |
West | DRAWING | 0 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LIVINGAREA | 0 |
North East | BEDROOM | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 1 |
South | STAIRCASE | 1 |
South West | TOILET | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 3 |
No. of Toilets | 4 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 157.79/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 1888 210 175 |
Staircase | 124 14 12 |
Balconies / Covered | 0 0 0 |
Garage / Servant Quarter | 0 0 0 |
Porch | 109 12 10 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2121 236 197 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 2325 258 216 | 1888 210 175 |
Covered Area on Ground | 1163 129 108 | 944 105 88 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.82 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 1 |
North East | KITCHEN | 0 |
East | DRAWING | 1 |
South East | DRAWING | 0 |
South | STAIRCASE | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRESSING / TOILET | 0 |
North East | KIDS BEDROOM | 1 |
East | BEDROOM | 1 |
South East | FAMILY LOUNGE | 0 |
South | STAIRCASE | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | KIDS BEDROOM | 1 |
East | MASTER BEDROOM | 1 |
South East | TOILET | 0 |
South | DRESSING / TOILET | 1 |
South West | DINING | 0 |
West | KITCHEN | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | KIDS BEDROOM | 1 |
East | MASTER BEDROOM | 1 |
South East | TOILET | 0 |
South | DRESS / TOILET | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | FAMILY LOUNGE | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | KITCHEN | 0 |
North East | DRAWING | 1 |
East | STAIRCASE | 0 |
South East | BEDROOM | 1 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | FAMILY LOUNGE | 1 |
East | STAIRCASE | 0 |
South East | BEDROOM | 1 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | DRESS / TOILET | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | DINING | 1 |
South East | KITCHIN | 1 |
South | KITCHIN | 0 |
South West | DRAWING | 0 |
West | STAIRCASE | 1 |
North West | BEDROOM | 1` |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | DRESSING | 1 |
South East | BEDROOM | 1 |
South | BEDROOM | 1 |
South West | FAMILY LOUNGE | 0 |
West | STAIRCASE | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 3 |
No. of Toilets | 3 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 120/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 1466 163 136 |
Staircase | 93 10 9 |
Balconies / Covered | 44.13 4.9 4.1 |
Garage / Servant Quarter | 0 0 0 |
Porch | 109 12 10 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 1712 190 159 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 1711 190 159 | 1466 163 136 |
Covered Area on Ground | 850 94 79 | 733 81 68 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.86 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 8 3 2.5 | 8 3 2.5 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 0 |
North East | DRAWING | 0 |
East | DRAWING | 1 |
South East | KITICHEN | 1 |
South | DINING | 1 |
South West | STAIRCASE | 1 |
West | TOILET | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | STUDY | 0 |
South | FAMILY LOUNGE | 0 |
South West | STAIRCASE | 1 |
West | TOILET | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 1 |
North East | STAIRCASE | 0 |
East | TOILET | 0 |
South East | BEDROOM | 1 |
South | DRAWING | 0 |
South West | DRAWING | 0 |
West | DRAWING | 0 |
North West | KITCHIN | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | FAMILY LOUNGE | 1 |
North East | STAIRECASE | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KITCHIN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | KITCHIN | 0 |
East | DINING | 1 |
South East | STAIRCASE | 0 |
South | TOILET | 1 |
South West | BEDROOM | 1 |
West | DRAWING | 0 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | STUDY | 1 |
East | FAMILY LOUNGE | 1 |
South East | STAIRCASE | 0 |
South | TOILET | 1 |
South West | BEDROOM | 1 |
West | TOILET | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 1 |
East | DRAWING | 1 |
South East | DRAWING | 0 |
South | DRAWING | 0 |
South West | KITCHEN | 0 |
West | DINING | 1 |
North West | STAIRCASE | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | STUDY | 0 |
West | FAMILY LOUNGE | 0 |
North West | STAIRCASE | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 3 |
No. of Toilets | 4 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 122/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 1493 166 139 |
Staircase | 93 10 9 |
Balconies / Covered | 41.98 4.66 3.9 |
Garage / Servant Quarter | 0 0 0 |
Porch | 109 12 10 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 1736 193 161 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 1711 190 159 | 1492 166 139 |
Covered Area on Ground | 850 94 79 | 734 82 68 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.87 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 8 3 2.5 | 8 3 2.5 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | DRAWING | 1 |
East | DRAWING | 1 |
South East | BEDROOM | 0 |
South | TOILET | 0 |
South West | TOILET | 1 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LIVING ROOM | 1 |
North East | LIVING ROOM | 1 |
East | LIVING ROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | TOILET | 1 |
West | DRESSING | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | TOILET | 0 |
East | DINING | 1 |
South East | KITCHEN | 1 |
South | DRAWING | 0 |
South West | DRAWING | 0 |
West | DRAWING | 0 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | TOILET | 0 |
East | DRESSING | 1 |
South East | BEDROOM | 0 |
South | LIVING ROOM | 0 |
South West | LIVING ROOM | 0 |
West | LIVING ROOM | 0 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | KIDS BEDROOM | 1 |
East | TOILET | 0 |
South East | TOILET | 0 |
South | DINING | 1 |
South West | KITCHEN | 0 |
West | DRAWING | 0 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | FAMILY LOUNGE | 1 |
North East | KIDS BEDROOM | 1 |
East | TOILET | 0 |
South East | STAIRCASE / TOILET | 0 |
South | DRESSING | 1 |
South West | BEDROOM | 1 |
West | LIVING ROOM | 0 |
North West | LIVING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 1 |
North East | KITCHEN | 0 |
East | DRAWING | 1 |
South East | DRAWING | 0 |
South | DRAWING | 0 |
South West | BEDROOM | 1 |
West | TOILET | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRESSING/ BEDROOM | 1 |
North East | KIDS BEDROOM | 1 |
East | FAMILY LOUNGE | 1 |
South East | FAMILY LOUNGE | 0 |
South | FAMILY LOUNGE | 0 |
South West | BEDROOM | 1 |
West | TOILET | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 4 |
No. of Toilets | 5 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 155/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 1578 175 147 |
Staircase | 90 10 8 |
Balconies / Covered | 33.3 3.7 3.09 |
Garage / Servant Quarter | 0 0 0 |
Porch | 91 10 8 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 1792 199 166 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 2034 226 189 | 1887 210 175 |
Covered Area on Ground | 1012 112 94 | 940 104 87 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.93 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 7 2 2.25 | 8 3 2.5 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | KITCHEN | 0 |
North East | DRAWING | 1 |
East | DRAWING | 1 |
South East | STAIRCASE | 1 |
South | DINING | 1 |
South West | TOILET | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | KIDS BEDROOM | 1 |
East | BEDROOM | 1 |
South East | STAIRCASE | 0 |
South | FAMILY LOUNGE / PASSAGE | 0 |
South West | DRESSING / TOILET | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LIVING / DINING | 1 |
North East | DRESSING | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | KITCHEN | 0 |
South West | DRAWING | 0 |
West | DRAWING | 0 |
North West | STAIRCASE | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | FAMILY LOUNGE/ PASSAGE | 1 |
North East | DRESSING | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET/ BEDROOM | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | STAIRCASE | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | STAIRCASE | 0 |
East | LIVING ROOM | 1 |
South East | DRESSING / TOILET | 0 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | KITCHEN | 0 |
North West | STAIRCSE | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | STAIRCASE | 0 |
East | FAMILY LOUNGE | 1 |
South East | DRESSING / TOILET | 0 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | KIDS BEDROOM | 1 |
East | KITCHEN | 0 |
South East | DRAWING | 0 |
South | DRAWING | 0 |
South West | STAIRCASE | 1 |
West | DINING | 1 |
North West | DRESSING / TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | KIDS BEDROOM | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | STAIRCASE | 1 |
West | FAMILY LOUNGE / PASSAGE | 0 |
North West | DRESSING / TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 3 |
No. of Toilets | 3 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 94/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 1158 129 108 |
Staircase | 93 10 9 |
Balconies / Covered | 44.13 4.9 4.1 |
Garage / Servant Quarter | 0 0 0 |
Porch | 109 12 10 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 1404 156 130 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 1453 161 135 | 1161 129 108 |
Covered Area on Ground | 721 80 67 | 579 64 54 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.8 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 8 3 2.5 | 8 3 2.5 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | DRAWING | 1 |
East | DRAWING | 1 |
South East | KITCHEN | 1 |
South | DINING | 1 |
South West | TOILET | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | TOILET | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | POOJA | 0 |
South West | TOILET | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 1 |
North East | TOILET | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRCASE | 1 |
South West | DRAWING | 0 |
West | DRAWING | 0 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | POOJA | 1 |
North East | TOILET | 0 |
East | BEDROOM, | 1 |
South East | BEDROOM | 1 |
South | STAIRCASE | 1 |
South West | TOILET | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | KITCHIN | 0 |
East | DINING | 1 |
South East | TOILET | 1 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | STAIRCASE | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 1 |
East | POOJA | 1 |
South East | TOILET | 1 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | STAIRCASE | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 100% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 1 |
East | STAIRCASE | 0 |
South East | DRAWING | 0 |
South | DRAWING | 0 |
South West | KITCHIN | 0 |
West | DINING | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | STAIRCASE | 0 |
South East | TOILET | 0 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | POOJA | 0 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 5 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 162/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 1971 219 183 |
Staircase | 123 14 11 |
Balconies / Covered | 43.59 4.84 4.05 |
Garage / Servant Quarter | 0 0 0 |
Porch | 109 12 10 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2246 250 209 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 2034 226 189 | 1971 219 183 |
Covered Area on Ground | 1012 112 94 | 986 109 92 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.97 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 7 2 2.25 | 7 2 2.25 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 1 |
North East | KITCHEN | 0 |
East | DRAWING | 1 |
South East | DRAWING | 0 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | FAMILY LOUNGE | 1 |
North East | KIDS BEDROOM | 1 |
East | BEDROOM | 1 |
South East | DRESSING | 1 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 100% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | KIDS BEDROOM | 1 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | DINING | 1 |
South West | KITCHEN | 0 |
West | KITCHEN | 0 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | KIDS BEDROOM | 1 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | FAMILY LOUNGE | 0 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | DRESSING | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | KITCHEN | 1 |
North East | DRAWING | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | DRESSING | 1 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 0 |
South West | TOILET | 1 |
West | FAMILY LOUNGE | 0 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | DINING | 1 |
South East | KITCHIN | 1 |
South | KITCHIN | 0 |
South West | DRAWING | 0 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | FAMILY LOUNGE | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | DRESSING | 1 |
West | BEDROOM | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 3 |
No. of Toilets | 3 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 93/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 1143 127 106 |
Staircase | 93 10 9 |
Balconies / Covered | 47.36 5.26 4.4 |
Garage / Servant Quarter | 0 0 0 |
Porch | 109 12 10 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 1392 155 129 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 1453 161 135 | 1147 127 107 |
Covered Area on Ground | 721 80 67 | 574 64 53 |
Balconies / Covered | 3 1 0.9 | 3 1 0.9 |
F.A.R. / F.S.I | 1 | 0.79 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 10 3 3 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 8 3 2.5 | 8 3 2.5 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 | 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | DRAWING ROOM | 1 |
East | BEDROOM | 1 |
South East | STAIRCASE | 1 |
South | DINING | 1 |
South West | KITCHEN | 0 |
West | BEDROOM | 1 |
North West | TOILET | 0 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | STAIRCASE | 0 |
South | LOBBY/ PASSAGE/DRESSING | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 0 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 1 |
North East | KITCHEN | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | DRAWING | 0 |
West | DRAWING | 0 |
North West | STAIRCASE | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LOBBY/ PASSAGE/DRESSING | 1 |
North East | BEDROOM | 0 |
East | BEDROOM, | 1 |
South East | TOILET | 0 |
South | TOILET | 1 |
South West | BEDROOM | 1 |
West | BEDROOM | 1 |
North West | STAIRCASE | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | STAIRCASE | 0 |
East | DINING | 1 |
South East | KITCHEN | 1 |
South | BEDROOM | 1 |
South West | BEDROOM | 1 |
West | TOILET | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | STAIRCASE | 0 |
East | LOBBY/ PASSAGE DRESSING | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | TOILET | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 1 |
East | TOILET | 0 |
South East | DRAWING | 0 |
South | DRAWING | 0 |
South West | STAIRCASE | 1 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | TOILET | 0 |
South East | BEDROOM | 1 |
South | BEDROOM | 1 |
South West | STAIRCASE | 1 |
West | LOBBY/ PASSAGE/ DRESSING | 1 |
North West | BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management