Semi Detached | |||
Semi Detached |
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 7 |
No. of Car Parks | 4 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 385.6/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 4654 517 432 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 4654 517 432 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 8719 969 810 | 4654 517 432 |
Covered Area on Ground | As per Set Back | 2249 250 209 |
Balconies / Covered | 5 2 1.5 | 5 2 1.5 |
F.A.R. / F.S.I | 2 | 1.07 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 20 7 6 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE/ TOILET | 1 |
North East | BEDROOM | 1 |
East | DRAWING ROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | KITCHEN | 0 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE/ TOILET | 0 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LIVING | 1 |
North East | KITCHEN | 0 |
East | BEDROOM | 1 |
South East | TOILET | 1 |
South | TOILET/ STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | STAIRCASE/ TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BALCONY | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | LIVING | 1 |
South East | KITCHEN | 1 |
South | BEDROOM | 1 |
South West | TOILET | 0 |
West | STAIRS/ TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | STAIRCASE/ TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | STAIRS/ TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | DRAWING | 1 |
West | TOILET | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | STAIRCASE/ TOILET | 0 |
South East | BEDROOM | 0 |
South | BALCONY | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 7 |
No. of Car Parks | 4 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 282.2/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3455 384 321 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3455 384 321 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 6781 753 630 | 3455 384 321 |
Covered Area on Ground | As per Set Back | 1664 185 155 |
Balconies / Covered | 5 2 1.5 | 5 2 1.5 |
F.A.R. / F.S.I | 2 | 1.02 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING/ LIVING | 1 |
North East | BEDROOM | 0 |
East | STAIRS/ TOILET | 0 |
South East | DRAWING | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LIVING | 1 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING | 1 |
North East | BEDROOM | 0 |
East | TOILET | 1 |
South East | KITCHEN | 1 |
South | DINING/ LIVING | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS/ DINING | 0 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET/ STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS/ DINING | 0 |
North East | DRAWING | 1 |
East | DRAWING | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | KITCHEN | 0 |
West | DINING/ LIVING | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | KITCHEN | 0 |
East | LIVING/ DINING | 1 |
South East | BEDROOM | 0 |
South | STAIRS/ TOILET | 1 |
South West | DRAWING | 0 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | LIVING | 0 |
South East | BEDROOM | 0 |
South | TOILET/ STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 7 |
No. of Car Parks | 4 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 287.9/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3580 398 333 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3580 398 333 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 6781 753 630 | 3580 398 333 |
Covered Area on Ground | As per Set Back | 1681 187 156 |
Balconies / Covered | 5 2 1.5 | 5 2 1.5 |
F.A.R. / F.S.I | 2 | 1.06 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | DRAWING ROOM | 1 |
East | DRAWING ROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | KITCHEN | 1 |
South | STAIRCASE | 1 |
South West | DRAWING ROOM | 0 |
West | DRAWING ROOM | 0 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | KITCHEN | 0 |
West | STAIRCASE | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRCASE | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | KITCHEN | 0 |
East | STAIRS | 1 |
South East | DRAWING ROOM | 0 |
South | DRAWING ROOM | 0 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | STAIRCASE | 0 |
South East | BEDROOM | 0 |
South | BALCONY | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 5 |
No. of Car Parks | 4 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 256.8/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3200 356 297 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3200 356 297 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 6283 698 584 | 3200 356 297 |
Covered Area on Ground | As per Set Back | 1532 170 142 |
Balconies / Covered | 5 2 1.5 | 5 2 1.5 |
F.A.R. / F.S.I | 2 | 1.02 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | DRAWING ROOM | 1 |
East | DRAWING ROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | WASH AREA | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | WASH AREA | 1 |
South East | KITCHEN | 1 |
South | DINING/ STAIRS | 1 |
South West | DRAWING ROOM | 0 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRCASE | 1 |
South West | MASTER BEDROOM | 1 |
West | BALCONY | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | WASH AREA | 0 |
South West | KITCHEN | 0 |
West | DINING/ STAIRS | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRCASE | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | WASH AREA | 1 |
North East | KITCHEN | 0 |
East | DINING/ STAIRS | 0 |
South East | DRAWING ROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | STAIRS | 0 |
South | BALCONY | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 6 |
No. of Toilets | 5 |
No. of Car Parks | 3 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 253.1/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 3200 356 297 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 3200 356 297 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 6283 698 584 | 3200 356 297 |
Covered Area on Ground | As per Set Back | 1514 168 141 |
Balconies / Covered | 5 2 1.5 | 5 2 1.5 |
F.A.R. / F.S.I | 2 | 1.02 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET/ DRESSING | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | KITCHEN | 1 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | TOILET/ DRESSING | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BALCONY | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | KITCHEN | 0 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | BEDROOM | 0 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESSING | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | KITCHEN | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | DRAWING | 0 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET/ DRESSING | 0 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BALCONY | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 5 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 238.5/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2732 304 254 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2732 304 254 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 5920 658 550 | 2732 304 254 |
Covered Area on Ground | As per Set Back | 1308 145 122 |
Balconies / Covered | 5 2 1.5 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 0.92 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 8 3 2.5 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 5 2 1.5 | 5 2 1.5 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | STAIRS/ DINING | 1 |
South West | KITCHEN | 0 |
West | WASH AREA | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BALCONY | 1 |
South East | LIVING | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET/ DRESSING | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS/ DINING | 1 |
North East | KITCHEN | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | TOILET/ DRESSING | 0 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BALCONY | 1 |
North West | LIVING | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | STAIRS/ DINING | 0 |
South East | KITCHEN | 1 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | LIVING | 1 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | TOILET/ DRESSING | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET/ DRESSING | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | DRAWING | 0 |
West | STAIRS | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET/ DRESSING | 0 |
North East | BEDROOM | 0 |
East | TOILET/ DRESSING | 0 |
South East | BEDROOM | 0 |
South | BALCONY | 1 |
South West | LIVING | 0 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 4 |
No. of Toilets | 4 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 233.51/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2678 298 249 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2678 298 249 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 5920 658 550 | 2678 297 249 |
Covered Area on Ground | As per Set Back | 1254 139 117 |
Balconies / Covered | 5 2 1.5 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 0.92 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 8 3 2.5 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 5 2 1.5 | 5 2 1.5 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | STAIRS | 1 |
South West | LIVING | 0 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | DRESSING | 1 |
East | BEDROOM | 1 |
South East | BALCONY | 1 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 87.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRES | 0 |
North East | LIVING | 1 |
East | DINING | 0 |
South East | KITCHEN | 1 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | DRAWING | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | DRESSING | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | STAIRS | 0 |
South East | LIVING | 0 |
South | DINING | 0 |
South West | KITCHEN | 0 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BALCONY | 1 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | KITCHEN | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | DRAWING | 0 |
West | STAIRS | 1 |
North West | LIVING | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | DRESSING | 1 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 5 |
No. of Car Parks | 2 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 239.04/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2732 304 254 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2732 304 254 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 5920 658 550 | 2732 304 254 |
Covered Area on Ground | As per Set Back | 1308 145 122 |
Balconies / Covered | 5 2 1.5 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 0.92 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 10 3 3 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 7 2 2 | 8 3 2.5 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 5 2 1.5 | 5 2 1.5 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | KITCHEN | 0 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 0 |
South | DINING | 0 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | STAIRS | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS/ DINING | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | TOILET | 1 |
South West | KITCHEN | 0 |
West | DRAWING ROOM | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | BALCONY | 1 |
North West | TOILET | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | DINING/ STAIRS | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | TOILET | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BALCONY | 1 |
North East | TOILET | 0 |
East | STAIRS | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | TOILET | 0 |
South East | KITCHEN | 1 |
South | DRAWING ROOM | 0 |
South West | DRAWING ROOM | 0 |
West | STAIRS/ DINING | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | BALCONY | 1 |
South West | TOILET | 1 |
West | STAIRS | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
Vastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 6 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 211.42/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2732 304 254 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2732 304 254 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 5425 603 504 | 2732 304 254 |
Covered Area on Ground | As per Set Back | 1308 145 122 |
Balconies / Covered | 5 2 1.5 | 4 1 1.2 |
F.A.R. / F.S.I | As per set back | 1.01 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | TOILET | 0 |
East | BEDROOM | 1 |
South East | DRAWING ROOM | 0 |
South | LIVING ROOM | 0 |
South West | KITCHEN | 0 |
West | BEDROOM | 0 |
North West | TOILET/ DRESSING | 1 |
Vastu Compliance Score ( Ground Floor ) | 25% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRCASE | 0 |
North East | BEDROOM | 1 |
East | BALCONY | 1 |
South East | BEDROOM | 1 |
South | FAMILY LOUNGE | 0 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | LIVING ROOM | 1 |
North East | KITCHEN | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | STAIRCASE/ TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | FAMILY LOUNGE | 0 |
North East | FAMILY LOUNGE | 1 |
East | BEDROOM | 1 |
South East | TOILET / DRESSING | 0 |
South | STAIRCASE/ TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR MASTER BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | LIVING ROOM | 1 |
South East | KITCHEN | 1 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | STAIRCASE/ TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 100% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | LIVING | 1 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET / DRESSING | 1 |
West | STAIRCASE/ TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 0 |
North East | TOILET | 0 |
East | STAIRCASE | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | DRAWING ROOM | 0 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET / DRESSING | 0 |
East | STAIRCASE/ TOILET | 0 |
South East | BEDROOM | 0 |
South | BALCONY | 1 |
South West | MASTER BEDROOM | 1 |
West | LIVING | 0 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management
Design overview & Area statement
Planning Details
Category | Counter |
---|---|
Type of House
Row Houses are attached to the houses on plots on either sides ,i.e. the open spaces are only left in front & rear while no open space is left on the left & right side Semi-Detached Houses In this case , the houses is attached to the neighboring house on side and detached on the other, i.e. open spaces are left in the front , rear and any one side. Detached Houses In this case , the house has open space on all 4 sides and is not attached to any neighboring structure. |
|
No. of Floors | 2 |
No. of Bedrooms | 5 |
No. of Toilets | 5 |
No. of Car Parks | 1 |
Carpet Area Carpet Area is the net / effective usable area within the house. As the name suggests , it is ideally the area where one can lay wall to all carpet all over the house. It is calculated by deducting the thickness of walls / floor area covered by walls from the Built up area. | 206.75/ |
Built up Area Statement
Category | Counter |
---|---|
Built up area Built up area here refers to the area permitted by the statutory authority ( municipal corporation or city development authority ) in the approval for construction/ approved drawings as per the relevant bye laws. Total Built up area of the house will be the sum of built up areas of all the floors. Built up area may differ from the actual construction area because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area and give such areas as a bonus. The exemptions for the purpose of calculation the built up area may vary from city to city. On adding back all the exempted area to the built up area , we get the total construction area which may be the basis on which professional service providers may charge you for their services. | 2683 298 249 |
Staircase | Included in built-up area |
Balconies / Covered | Included in built-up area |
Garage / Servant Quarter | 0 0 0 |
Porch | 0 0 0 |
Total Construction Area Total Construction Area refers to the entire surface area of concrete slabs. In most cases, Architects, contractors and other agencies that quote the rates for their service on per sft ( per unit) basis, multiply the agreed rate with the total construction area. The construction area may exceed the built up area permitted in your approval drawings. This is because many urban local bodies does not count certain areas like balconies, staircases, projections, over head water tanks etc. while calculating the permissible built up area. Total construction area is the sum total of permitted built up area plus all the other construction like stairs, porch , balconies etc. It may also be referred to as Super Built up Area. | 2683 298 249 |
Statutory building rules compliance
Building Metric | Permissible | Proposed |
---|---|---|
Built up area | 5425 603 504 | 2683 298 249 |
Covered Area on Ground | As per Set Back | 1283 143 119 |
Balconies / Covered | 5 2 1.5 | 4 1 1.2 |
F.A.R. / F.S.I | 2 | 0.99 |
Front Open Space Front Open Space is the open space left between the road side boundary or front boundary of the plot and the house. Every municpal building Bye law requires a minimum open space to be left on the front. The space left shall not be less the minimum open space required by the bye laws / rules. | 15 5 4.5 | 15 5 4.5 |
Rear Open Space Rear Open Space is the open space left between the rear side boundary of the plot and the house. Every municipal building Bye law requires a minimum open space to be left on the rear. The space left shall not be less the minimum open space required by the bye laws / rules | 10 3 3 | 10 3 3 |
Right Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 10 3 3 | 10 3 3 |
Left Side Open Space Side Open Spaces is / are the open spaces left between the side boundaries of the plot and the house. Municipal building Bye law may or may not require minimum open space to be left on one or both the sides. Houses with no side open spaces are called row houses, those with open space on only one side are called semi detached and those with open spaces on both sides are called detached houses | 0 0 0 | 0 0 0 |
Vastu Compliance Assessment
Select orientation / direction of your plot from the above drop down to see whether this plan is suitable for your plot as per vastu. For e.g. if your plot is East facing, select East.
Select orientation / direction of your plot
Detailed Assessment Scorecard
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DINING | 0 |
North East | KITCHEN | 0 |
East | DRAWING ROOM | 1 |
South East | DRAWING ROOM | 1 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | STAIRS | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | TOILET | 0 |
South | TOILET | 1 |
South West | MASTER BEDROOM | 1 |
West | BEDROOM | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRS | 1 |
South West | KITCHEN | 0 |
West | KITCHEN | 0 |
North West | DRAWING ROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 37.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | TOILET | 0 |
North East | BEDROOM | 0 |
East | BEDROOM | 1 |
South East | BEDROOM | 0 |
South | STAIRCASE | 1 |
South West | MASTER BEDROOM | 1 |
West | BALCONY | 1 |
North West | TOILET/ DRESSING | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | DRAWING ROOM | 1 |
North East | DRAWING ROOM | 1 |
East | TOILET | 0 |
South East | TOILET | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 1 |
West | DINING | 1 |
North West | KITCHEN | 1 |
Vastu Compliance Score ( Ground Floor ) | 75% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | TOILET | 0 |
East | TOILET | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | MASTER BEDROOM | 0 |
West | STAIRCASE | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | DINING | 0 |
South East | KITCHEN | 1 |
South | DRAWING ROOM | 0 |
South West | DRAWING ROOM | 0 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 50% |
Direction / Quadrant | Room / Use Area | Vastu Compliance |
---|---|---|
North | BEDROOM | 1 |
North East | BEDROOM | 0 |
East | STAIRCASE | 0 |
South East | BEDROOM | 0 |
South | BEDROOM | 1 |
South West | TOILET | 1 |
West | TOILET | 1 |
North West | KIDS OR GUEST BEDROOM | 1 |
Vastu Compliance Score ( Ground Floor ) | 62.5% |
Vastu Assessment Score
Vastu Assessment Score for East Facing Plot
EASTVastu Assessment Score for West Facing Plot
WESTVastu Assessment Score for North Facing Plot
NORTHVastu Assessment Score for South Facing Plot
SOUTHSponsor Architect
Hitesh Ahuja Exp. 15+ Years
- Qual.: B.Arch
Expertise: Architecture , feasibility analysis , interior design , market strategy , planning , project management